Suction Mining Equipment
-
Stationary petroleum motor of 36 CV
- Set up in a frame with solids pump
- Cutterhead, covered with exchangeable plates of iron; rotor of 4 blades
- Admission or suction semi rigid hose of 6 inches, end heading head iron hose of 6 inches
- Unload hose sluices of 6 inches
- Compressor equipment of 2 heads 150 psi
- Filter of carbon element, air hose 3/8 inches x 100 meters. Mouth piece, mask, lead weight belt and scuba diving outfit.
Additional equipment
- Aluminium slider, outboard motor
- Gas or kerosene stove, silverware, plates etc
- First aid kit
- Kerosene refrigerator
- Amalgamating equipment (mixer 4 P.C.)
- Welding torch
Estimated investment: $ Output: Gross / average / month 25 g. x 25 day/month + 750 gr. = $ Monthly income, including 30 percent
Personnel
- 1 administrator, owner of the raft
- 1 cook
- 3 divers (operate 3 hours each)
Suction dredge equipment of 8 inches This is made up by the following basic elements:
Floating raft:
- Two metallic pontoons of iron with divisions and access hatch
- Pontoon diameter: 1.28 meters
- Length: 14.40 meters
- Beams, floors, cover structure: wood
- Ceiling cover: calamine of corrugated aluminium
- Two wooden sluices of wood 3.20 x 7.00 meters
- Screen sieve 3/8 inches structured iron
Suction equipment
- Diesel motor 110 HP
- Transfer box
- Solids pump
- Lifting lug
- Full scuba diving equipment
- Compressor equipment 220 Psi
- Solids suction admission tubing of iron 8 inches connexion to Canalflex 8 inches.
- Discharge hose 8 inches
Complementary equipment
- 1 aluminium slider
- 1 gas or kerosene stove, silverware etc
- 1 first aid kit
- 1Kerosene refrigerator
- Amalgamating equipment
- 1 Welding torch
Estimated investment: $ Output:
- Gross monthly average:
- Treated gravel: 14 m3 x 10 hours x 25 = $
- 50 gr./day x 25 days = 1,250 gr./month = $
- Monthly income = $
- Monthly average = $
Personnel:
- 1 administrator, owner of the raft
- 1 cook
- 1 motor mechanic
- 2 wince operators
- 1 scuba diver
|