gold mining
Hydraulic disintegration -- Usage of monitors
gold stocks
precious metal futures
gold investment
gold silver bars

 

prospecting for gold and silver
gold panning
look & drill for gold

Hydraulic disintegration --
Usage of monitors

 

Monitor 1
Investment: $
Motor pump of 4 inches x 16 HP. Bs. S.
Suction hose of 4 inches
Check valve of 4 inches
Hose terminal spiral nipple of 3 inches that serves as a nozzle
100 meter intake hose of 4 inches high pressure
Motor pump placed over a raft that can run along the edge of the river and with movement of one hundred meters of the mount.
It requires differences of levels of 4 to 5 meters
Performance: 150 m3/day x 8 working hours, which equals to 25 workers per day.
Monthly outcome for one shift: 3,750 m3.
Unitary price and cost: $ 

Monitor 2
Investment: $
Motor pump of 6 inches x 36 C.V. Diesel
Suction hose of 6 inches
Check valve of 6 inches
Hose terminal spiral nipple of 6 inches sot 4 inches of exit
200 meter semi rigid hose of 6 inches
This can move along all the way through the length of the ledges in a raft mounted on pontoons.
Requires of differences of levels 4 to 5 meters
Performance: 1,000 m3/day x 16 working hours, which is the same as 160 labourers a day.
Unitary price and cost for m3: $ 

Monitor 3
Investment: $
Similar to monitor 2 but a more solid pump of Cravely Motor 36 CV
Works in mountain of over 200 meters of a hydraulic source
Does not require a drain
Eliminates at depression of the terrain through a pressure pump the disintegrated substances
Performance: 500.00 m3/day
Unitary price and cost: $

Mini dredge hydrojet system
Basic elements:
2 plastic pontoons or inner tube
Aluminium sluice
Aluminium riffle
1 sluice base rug
Aluminium mounting or that of another material
1 high pressure water pump
1 steel tubing power jet
1 pressure power jet hose
1 added motor compressor
1 scuba diving outfit with implements

Diameter suction and motor potency

  • Mini dredge 2 inches requires B.S. motor of 3 HP
  • Mini dredge 3 inches requires B.S. motor of 8 HP
  • Mini dredge 4 inches requires B.S. motor of 8 HP
  • Mini dredge 6 inches requires B.S. motor of 10 HP
  • Mini dredge 8 inches requires B.S. motor of 32 HP (2 x 16 HP)

In mini dredges of 8 inches it is required to mount 2 motors and 2 pumps of high pressure of 16 HP each, which are connected to the power jet with two hose entries of high pressure of 3 inches.

 

Gold Mining &  Gold Prospecting Technologies in Alluvial Auriferous Mining Battery Jigs Impact Deflector Sluices Height of Material Elevation Gold Pockets Hydraulic disintegration -- Usage of monitors Suction Dredges: Description & Performance Bucket Dredges Suction Mining Equipment Suction dredge equipment of 12 inches Dry Mining Separation of Gold by Centrifuging Hydro Cyclones Gravimetric separation in vibration platforms Exploitation of Artisanal Gold

Google
 
Web www.e-goldprospecting.com
 

gold rocks + minerals
sluice box