Gold Process Extraction Design Considerations

Always we must consider that there is a little possibility that the results from lab

 

can not be reproduced exactly to industrial level. In the lab are feasible get trends about the metallurgical behaviour of the ore. If the results are excellent, the plant will have excellent results too, although not in the same proportion. In order to have a better idea must be carried out a pilot test, but some times that is not possible.

Tests executed in the lab are most the time done in exceptional conditions, mainly when the testwork was carry out of the mine. An ideal condition is simulate the future conditions of the operation, and this includes environmental aspects.

Start a new operation needs time for a good approximation to the results obtained in the lab. The work consists in evaluate each equipment until it can work in the best operative conditions according its design. In the lab, in order to obtain a particular mesh size in grind can be used a graph and extrapolate the required time. In a plant for obtaining a particular mesh of grind must be analyzed the grinding-classification process because during the phase of engineering were considered many aspects such as circulating load, maximum size of ball, apex and vortex diameter, speed of pumps, solids percentage, etc. All these variables have influence in obtain the wished product during grinding. The experience of designer and operators will favor the stability of the grinding circuit to the best operative conditions.

The recovery obtained in the lab must be balanced with the grade in the feed and the tails, and no must be considered any losses of gold from solutions. This loss will be minimized when the washed system of final products can be improved or perhaps with a better recycling of solution to the circuit. In the best case this loss will not be more than 0.5% and must be consider by the designer for respective evaluations.

As was mentioned, the consumption of reagents is lower in an industrial plant owe

 

to recycling of solutions. Ergo, operative costs can be lower. Sometimes, the difficult task is calculate the amount saved but it’s possible get an idea having a mass balance.

The final optimization is done to industrial scale and during the operation. Experience of the designer and operators will save time and the final point will be got in the short time. It is unusual get the best results in the first hours of operation. It is very important have a good metallurgical laboratory in order to evaluate each part of the process and obtain the best operative conditions.

 

Gold Mining &  Gold Prospecting Gold Leaching Gold Leaching with acidic thiocyanate Gold Leaching with THIOSULPHATE Leaching Gold with Bromine Leach Gold by Chlorination Gold Leaching using Thiourea Mackie Continuous Vat Gold Leaching GOLD LEACHING WITH IODINE Tailings Disposal Traditional vat gold leach involves fours stages Gold Recovery Types of VAT Leaching Gold Process Extraction Design Considerations Design a preliminary gold flowsheet INCREASING Gold TREATMENT BY OPTIMIZATION.: EXPANDING A Gold PLANT Example of Gold Process Design and Selection Gold Cyanidation Tests Metallurgical tests for gold leaching Cyanidation Metallurgical testing How to Design a New Cyanidation Plant Gold Heap and Pad Valley Gold Leach Method. Basic Chemistry and ore characteristics required for heap leaching Location and Climatic Considerations in Gold Heap Leaching Gold Heap Leach Components Gold Pregnant solution containment Gold Solution Application & Collection Systems Expanding Gold Leach Pad method. Regulatory and permitting considerations Gold Heap Leach Methods Analyze the cyanide presents in the pulp for controlling the process Type of screen used in carbon in Pulp CIP TIPS FOR A CIP PROCESS Activated Carbon Regeneration ReLoading Electrowinning of Gold Gold Elution - Carbon Stripping Gold Leaching Time Requirements CARBON IN PULP PROCESS Activated carbon in Gold Leaching and Recovery CIP Gold Leaching AUXILIARY AGENTS IN Gold CYANIDATION Gold Contaminant Affecting Leaching - Cyanidation CARBON-IN-PULP  PROCESS: CIP  Gold Cyanidation DESIGN AND OPERATION OF HEAP LEACHING SCALING AND DESIGN OF CYANIDATION PLANTS Gold VAT Leaching OR Flooded Heap Leach Leaching Gold Without Cyanide; Alternative Methods;  thiourea, thiocyanate, thiosulphate, bromine, chlorine, and iodine