gold mining
Additional Equipment for Dredging
gold stocks
precious metal futures
gold investment
gold silver bars

 

prospecting for gold and silver
gold panning
look & drill for gold

Additional Equipment for Dredging

  •  

    1 aluminum slide.
  • 1 gas or kerosene stove, movables.
  • 1 first aid kit
  • 1 kerosene refrigerator
  • 1 amalgamator equipment
  • 1 blow-pipe burner of propane gas

Estimated Investment: US$ 35,000

Efficiency

  • Gross average per month:
  • Treated gravel: 14 m3 x 10 hs. x 25 = US$ 3,500 m3
  • 50 gr./day x 25 d. = 1,250 gr./month = 18,750
  • Monthly expense = 2,000
  • Average Utility Per Month = 16,750

Personnel Used

  • 1 manager
  • 1 cook
  • 1 mechanic motorist
  • 2 winchers
  • 1 diver (emergency)

 

Gold Mining &  Gold Prospecting Extraction and Processing Technologies Dredge Equipment for 12 Inches Suction Dredge Equipment of 8 Inches Suction Dredge Equipment, Raft Type of Six Inches of Suction Water Type Dredges Optional Equipment for Dredge Equipment Additional Equipment for Dredging Monitoring Alluvial Mining 1 Monitoring Alluvial Mining 2 Monitoring Alluvial Mining 3 Mini Dredges Hydro jet System Neophyte Dredges: Description, Function

Google
 
Web www.e-goldprospecting.com
 

gold rocks + minerals
sluice box